Level of Achievement with Reference to Indicators
Vietnam / Output-2
Indicators in PDM ver. 1.2 |
Level of Current Achievement |
Target in December 2015 |
2-1. Number of courses conducted for new CNS/ATM system basic training |
The Vietnamese C/P has developed the New CNS/ATM Systems Training “Basic Course”. The training plan is under preparation with starting of actual training in mid 2013. |
CAAV, VATM, ACV and VAA will have organized and conducted basic training courses of the new CNS/ATM systems at least 3 or 4 times in 2014 and 2015. |
2-2. Ratio of air traffic controllers and air navigation technical staff who have completed the new CNS/ATM system basic training course |
Nil. The training plan is under preparation with a target of 40% coverage by the end of 2013. |
100% of CAAV technical staff members and VATM/ACV air traffic controllers and air navigation technical staff will have attended and completed in-house training programs at basic level for the new CNS/ATM systems. |
2-3. Number of instructors who can operate and improve the new CNS/ATM system basic training courses |
16 officials have completed instructor training on Basic Course and are capable of operating and improving the course. |
VATM, ACV and VAA will have 10 instructors who can operate and improve basic training courses for the new CNS/ATM systems. |
2-4. Number of courses conducted for new CNS/ATM system advanced training |
Nil. Advanced courses will be started in 2014. |
CAAV, VATM, ACV and VAA will have organized and conducted advanced training courses of the new CNS/ATM systems at least 2 to 4 times in 2014 and 2015. |
2-5. Ratio of air traffic controllers and air navigation technical staff who have completed the new CNS/ATM system advanced training course |
Nil. Advanced courses will be started in 2014. |
40% of CAAV technical staff members, and VATM/ACV air traffic controllers and air navigation technical staff will have attended and completed in-house training programs at advanced level for the new CNS/ATM systems. |
2-6. Number of instructors who can operate and improve the new CNS/ATM system advanced training courses |
Instructor training on the advanced course will be started in 2013. |
VATM, ACV and VAA will have 6-10 instructors who can operate and improve advanced training courses for the new CNS/ATM systems. |